Results we sign.
Studies, detailed designs, grid-access opinions and free-market management, across Brazil.
150+ MWac
approved in grid-access opinions
At utilities and on the national grid.
30+
detailed designs
DG, utility-scale plants and BESS, from feasibility to connection.
40+
regulatory opinions
and technical analyses delivered to investors and generators.
10+
states with active projects
Working across Brazil.

Public sector · São Paulo state
Distributed generation for a municipal government (São Paulo state)
The municipal government needed to cut the energy costs of public buildings with distributed solar generation.
Amatiri scope
- Complete detailed design of the DG solar plants
- Full permitting of the project
- Technical structuring that enabled approval of the BNDES financing
BNDES financing approved
Logistics and bioenergy · São Paulo
3 MWp of distributed generation on the logistics warehouses of a sugar-and-ethanol group (SP)
Rooftop distributed generation on logistics assets, connected in the Enel SP concession area.
Amatiri scope
- Detailed design for 3 MWp on warehouse rooftops
- Preparation and management of the grid-access request
Grid access approved at Enel SP


Storage (BESS) · Lins, SP
120 MW / 480 MWh of battery storage registered for LRCAP 2026
An investor engaged Amatiri to develop and qualify a battery project in Lins (SP) for the country’s first capacity auction with storage.
Amatiri scope
- Detailed design of the storage system (120 MW / 480 MWh)
- Complete registration of the project at EPE for LRCAP 2026
Registered at EPE · LRCAP 2026