Aerial view of an operating photovoltaic solar plant

Engineering and regulation for those who build Brazil’s power system.

From feasibility to operation: plants, storage, auctions and due diligence.

Where do you start?

Three situations, three routes. The full list of service lines sits one click away.

Engineer inspecting a solar plant

Funds, lenders, acquirers

You are buying or funding a Brazilian asset

Independent technical review, market context and the risks that only surface in the paperwork.

Solar plant under construction

Generators, developers, EPCs

You already own or are building in Brazil

Grid access, licences, auctions and day to day representation before ANEEL, ONS and CCEE.

Battery energy storage containers

Equipment manufacturers

You sell equipment into Brazil

Accreditation of your company and your products with BNDES, a precondition for financing and for local content in auctions.

150+ MWac

approved in grid-access opinions

At utilities and the ONS.

30+

detailed designs

DG, utility-scale plants and BESS, from feasibility to connection.

40+

regulatory opinions

and technical analyses delivered to investors and generators.

10+

states with active projects

Working across Brazil.

Delivered projects

Signed, approved and financed engineering.

Rooftop solar panels on a public building

BNDES financing approved

DG for a municipal government (interior of São Paulo state)

Detailed design, licensing and financing structuring.

Aerial view of solar panels on logistics warehouse rooftops

Grid access approved at Enel SP

3 MWp on a sugar and ethanol group’s logistics warehouses (São Paulo)

Detailed design and grid-access opinion.

Rows of battery storage containers next to transmission lines

Registered with EPE

Registration of 120 MW / 480 MWh of BESS

Detailed design and technical qualification with EPE for LRCAP 2026.

What changed in the regulation

Access, curtailment compensation and storage rules were rewritten in eight months. What that changes in your asset’s economics is in our analyses.

Comparison between 38 GW of data centre grid-access requests announced by the MME and 7.0 GW actually formalised at the ONS with financial guarantees

To discuss a project, an investment thesis or an operating asset.