Data · BDGD ANEEL · reference date 31 December 2024

Brazil’s electricity distribution market, in numbers

Low, medium and high voltage, public lighting and distributed generation, tabulated record by record from the official databases of the 101 utilities and checked against SAMP, the market monitoring system of ANEEL, the Brazilian electricity regulator, and against the Statistical Yearbook of EPE, the Brazilian energy research office. Every number on this page carries a stated source, a written tabulation criterion and a noted limitation.

51 concessionaires50 permissionaires105.7 million records33 GB processed495.2 TWh tabulated

Before any number

Why 495 TWh does not contradict EPE’s 561.6 TWh

The EPE Statistical Yearbook of Electricity records total consumption of 561.6 TWh in Brazil in 2024. This tabulation reaches 495.2 TWh. Both numbers are right and they measure different things. Explaining the difference is the first useful piece of information on this page, because anyone who cross-checks the two sources without understanding the scope concludes that one of them is wrong.

The BDGD, the geographic distribution database each utility is required to file with ANEEL, portrays what ran through the utility networks. A consumer connected directly to the basic grid, at 230 kV or above, appears in no utility database at all, by definition: it is served by transmission. Broken out class by class, the gap is almost entirely explained, and the residual stays within what is expected for classification differences.

ClassEPE · TWhBDGD · TWhDifference
Industrial197.6142.255.4
Rural31.425.16.2
Residential176.0170.85.2
Commercial and services104.1100.43.7
Own consumption3.50.53.0
Public utility service17.616.80.8
Public administration17.617.7-0.1
Public lighting13.313.5-0.2
Total561.1487.074.1
74.1 TWhof difference between total consumption at EPE and final consumption metered on the distribution networks
55.4 TWhis industry outside the distribution networks, which accounts for 75% of the gap
8.3 TWhof the 495.2 TWh market is supply between utilities, not final consumption

Two control points confirm that the database is sound. Public lighting closes at 13.3 TWh in EPE against 13.5 TWh in the BDGD, a difference of 1.5%. Residential closes at 176.0 against 170.8 TWh, a difference of 3.0%, consistent with residential customers served at medium voltage and with simultaneous self-consumption from distributed generation, which the utility does not bill and therefore does not record. In the two classes where the BDGD should see practically everything, it sees practically everything.

The practical consequence is about which question each source answers. To size national consumption, EPE. To size the market that runs through the distribution network, which is the addressable market for whoever sells energy to consumers, provides services to utilities or connects generation to the grid, the BDGD. The 74.1 TWh of difference are, for the most part, a market that is no longer contestable by way of distribution.

The table adds up the eight classes published in the Yearbook, 561.1 TWh, against 561.6 TWh of total consumption. The EPE classes and the classes in the ANEEL Data Dictionary, revision 3, are not identical. The comparison above is one of order of magnitude by class, not of accounting equality.

Overview

Five markets, one 495 TWh system

Adding up what the 101 utilities billed in 2024 to captive and free-market consumers on their networks, the distribution market moved 495.2 TWh. Low voltage accounts for half the energy and for 99.7% of the units. Medium and high voltage, with 0.3% of the units, carry 47%, and that is where the free market already dominates. Distributed generation, with 36.3 GW installed, exported 37.2 TWh to the grid, equivalent to 7.7% of all the energy distributed to consumers.

247.6 TWhLow voltage · 89.6 million consumer units (UCs)
144.4 TWhMedium voltage · 299,793 UCs
89.8 TWhHigh voltage · 2,135 UCs
13.5 TWhPublic lighting · 20.5 million lighting points
36.3 GWDistributed generation · 3.19 million plants

Energy supplied by segment

TWh billed to active units · distributed generation is energy exported to the grid, not added to the consumption segments

Low voltage247.6 TWh
Medium voltage144.4 TWh
High voltage89.8 TWh
Public lighting13.5 TWh
Distributed generation37.2 TWh

Captive and free, the three consumption segments

active units and billed energy in 2024 · free market includes free and special consumers

SegmentActive UCsEnergy · TWhFree-market UCsFree-market energy · TWhFree shareCaptive · TWh
Low voltage89,579,645247.63480.50.2%247.1
Medium voltage299,793144.455,70694.865.6%49.6
High voltage2,13589.81,74785.695.3%4.2
Total consumption89,881,573481.857,801180.837.5%300.9

This is the table that decides the most. The free market already holds 37.5% of the energy consumed with 57,801 units, which comes to 0.06% of the units in the country. On the other side, the remaining captive market adds up to 300.9 TWh, and 247.1 TWh of that, or 82%, sits in low voltage, where migration has not started yet.

For anyone building an energy retail operation, the relevant number is not the size of today’s free market. It is the distance between the 57,801 units already migrated and the 89.6 million low voltage units that Law No. 15,269 of 24 November 2025 placed on the horizon. The difference in scale between managing thousands and managing tens of millions of contracts is the systems engineering problem that decides who will be able to operate in that market.

The 15 largest utilities by energy supplied

TWh per year · bars stacked by segment

Low voltageMedium voltageHigh voltage
CEMIG-DMG50.1 TWh
Enel SPSP42.9 TWh
CPFL-PAULISTASP34.1 TWh
COPEL-DISPR33.4 TWh
CELESCSC27.6 TWh
LIGHT SESARJ25.1 TWh
COELBABA21.1 TWh
ELEKTROSP19.3 TWh
RGE SULRS19.3 TWh
EQUATORIAL GOGO17.1 TWh
EDP SPSP16.7 TWh
CPFL PiratiningaSP15.8 TWh
Neoenergia PEPE13.8 TWh
ENEL RJRJ11.7 TWh
EDP ESES11.7 TWh

The ten largest networks concentrate between 54% and 73% of the energy depending on the segment, but the composition of each one is different and that changes the nature of the business. Cemig D is the largest in the country by total energy and has 34% of it in high voltage, an industrial network profile. Enel SP is the largest in the country in low voltage, with 25.5 TWh, and has only 11% of its energy in high voltage: an urban retail network profile. Light and EDP SP have a high voltage share above the average. Whoever sells services, equipment or energy to a utility is selling to different businesses that carry the same name.

Concessionaires and permissionaires

the 101 utilities split into two concession grant regimes at very different scales · permissionaires are the smaller permit-holding utilities, mostly rural cooperatives

Segment51 concessionairesTWh50 permissionairesTWhPermissionaire share
Low voltage88,923,267 UCs245.2656,378 UCs2.30.73%
Medium voltage295,422 UCs142.54,371 UCs1.91.46%
High voltage2,132 UCs89.73 UCs0.10.14%
Public lighting20,192,338 points13.3273,439 points0.11.34%
Distributed generation3,150,562 plants36.836,789 plants0.41.15%

The 50 permissionaires, almost all rural electrification cooperatives, serve 656,378 low voltage units, or 0.73% of the national total, and bill 2.3 TWh. In the country aggregate they are a rounding item. In the distributed generation statistics they are not: they hold 1.15% of the plants and the highest penetration in the country, 5.6 plants per 100 consumer units against 3.5 for the national average. The explanation lies in the overlap between rural area, available roof, the B2 tariff and a membership base that decides on investment collectively. Whoever studies the diffusion of distributed generation will find the country’s highest adoption rate there.

Interpretation

What these numbers decide

Market data on its own decides nothing. What follows is the reading Amatiri makes of where these numbers change a project, origination or investment decision, and where the database does not support the conclusion usually drawn from it. Every regulatory statement carries the rule, its number and its date.

The free market has already won medium and high voltage. What is left is 247 TWh in low voltage

MME Normative Ordinance No. 50/GM/MME of 27 September 2022, issued by the Brazilian Ministry of Mines and Energy, opened the free market to every tariff Group A consumer as of 1 January 2024, with the caveat that a consumer whose individual load is below 500 kW has to be represented by a retail agent at CCEE, the Brazilian power trading chamber. Two years later, the contest is largely settled. In high voltage, 95.3% of the energy already belongs to free-market consumers and 388 captive units remain. In medium voltage, 65.6% has already migrated. What has not migrated in the two segments combined adds up to 53.8 TWh, and most of it sits in small units, below the threshold above which the retail agent requirement falls away.

Low voltage is practically untouched: 348 free-market units out of 89.6 million, 477 GWh of a 247.6 TWh market. It is the only segment where migration has not started, and on its own it carries almost five times more captive energy than medium and high voltage together.

Law No. 15,269 of 24 November 2025 amended Law No. 9,074 of 7 July 1995 and extended supplier choice to consumers served below 2.3 kV. The clock runs from the date the provision takes effect: up to 24 months for industrial and commercial consumers and up to 36 months for everyone else. Anyone sizing trading structure, energy backing, collateral and customer service for the next three years is sizing for 89.6 million connection points, not for what is left of tariff Group A. That is an order-of-magnitude change in registry, billing and arrears management, not an extension of the current business.

Captive energy by segment

TWh billed in 2024 · bar width is proportional to the segment total

Low voltage247.1 TWh captive
Medium voltage49.6 TWh captive
High voltage4.2 TWh captive
already in the free marketstill captive

The turquoise block in low voltage alone is larger than the entire medium and high voltage markets combined.

In distributed generation there are two markets carrying the same name

Calling both of them distributed generation hides a difference of two orders of magnitude in the size of the unit. What sits in low voltage is rooftop, at 8.4 kW of average capacity, sold by an installer, with a standardized design and an individual purchase decision. What sits in medium voltage is a plant: 52,205 plants with average capacity of 189 kW, with a grid access opinion, a connection study, interconnection protection and a named engineer of record.

The proportion in the chart is the entire argument. Medium voltage is 1.6% of the plants and 27.2% of installed capacity: 9.85 GW against 26.4 GW in low voltage, with less than one sixtieth of the plant count. These are two businesses with different acquisition cost, sales cycle and engineering requirement, counted in the same statistic.

Law No. 14,300 of 6 January 2022 separated the two by definition: microgeneration up to 75 kW and minigeneration above 75 kW, capped at 5 MW for a dispatchable source and 3 MW for a non dispatchable one. The same law granted, in Article 26, a transition rule valid until 31 December 2045 to anyone who already had a system installed or filed an access request within twelve months of publication. The 36.3 GW fleet shown here is, in large part, a fleet holding a vested right to a rule that does not come back.

Two counts of the same fleet

share of each connection level in plant count and in installed capacity

Number of plants3.19 million
Installed capacity36.3 GW
low voltage · 8.4 kW averagemedium voltage · 189 kW average

1.6% of the plants carry 27% of the capacity. That is where the 0.5 to 5 MW project lives.

Eleven percent is not the performance of distributed generation. It is the fraction left over

Dividing energy exported to the grid by installed capacity gives a number that looks like a capacity factor and is not. The BDGD records what crosses the meter toward the grid. What a unit generates and consumes at the same instant never passes through there and does not exist in this database. The ratio of 11.0% in low voltage is the exported fraction, not the output of the system, and total generation is larger than what is recorded.

The gap between 11.0% in low voltage and 13.6% in medium voltage is exactly that: minigeneration in medium voltage is often remote generation that exports almost everything, while a residential rooftop consumes part of the output on site. The larger the self consumption, the smaller the ratio, with nothing changing in the performance of the equipment.

Any estimate of energy generated by distributed micro and mini generation (MMGD) built from the BDGD understates the fleet, and any estimate of net metering credit revenue built from capacity overstates it, because only what was exported to the grid is credited. For power flow and hosting capacity studies, the right number is the exported one, which is what the grid sees. For an energy market study, it is not.

What the database sees of generation

the BDGD measures the meter, not the plant

simultaneous self consumptionnot measured in this database
energy exported37.2 TWh recorded in 2024

total system generation

The dashed share exists physically and has no known size in this database. That is why the ratio of 11.0% measures export, not output.

High voltage: the list of large loads for the entire country has 2,135 rows

It is the most concentrated of the five segments, with a Herfindahl-Hirschman Index (HHI) of 751 and 73.2% of the energy in the ten largest networks. Eighty-one percent of the energy is industry, at an average consumption of 47.9 GWh per year per unit. Another 5.5% is supply from one utility to another, which is not final consumption and has to come out of any total.

The public utility service line, with 157 units and 5.6 TWh, is water and sanitation plus rail traction: treatment plants, pumping stations and subways. It is load with a predictable profile, public contracting and a long decision cycle, and it is where efficiency and load flexibility studies have the most technical room.

For anyone originating long term contracts, structuring behind the meter storage or assessing load for a dedicated connection, the entire universe of targets fits in a two thousand row spreadsheet, and 61 of the 101 utilities can be discarded at the outset. This is not a mass prospecting market, it is a closed list market, and whoever holds the list has the market mapped.

High voltage energy by class

TWh per year · 2,135 consumer units at 69 kV or above

Industrial72.8 TWh
Public utility service5.6 TWh
Supply between utilities4.9 TWh
Commercial and services4.7 TWh
Public administration and rural1.8 TWh

1,520 industrial units account for 81% of the energy in the segment. Forty utilities have a high voltage consumer; 61 of the 101 have none.

Public lighting is the only one of these markets with a physical queue already counted

Unlike the other four, this one depends on no migration decision and on no regulatory window. The technology swap is construction work, the asset is registered point by point in the utility’s database, and the funding source already exists: Article 149-A of the Federal Constitution, added by Constitutional Amendment No. 39 of 19 December 2002, authorizes municipalities and the Federal District to levy a charge to fund the public lighting service, collectible on the electricity bill itself.

There are 12.87 million lighting points on discharge lamps, spread across municipalities, with address and coordinates, against 6.75 million already converted to LED. Inside the block still to convert, 1.34 million is mercury vapor, which has a deadline of its own: the high pressure lamp for general lighting appears in Annex A of the Minamata Convention on Mercury, enacted in Brazil by Decree No. 9,470 of 14 August 2018, among the products whose manufacture, import and export were to be phased out by 2020.

It is the only one of the five in which BDGD data works directly as a project inventory, and it is what sizes the municipal public private partnership market for lighting.

Lighting fleet by technology

20.39 million registered lighting points

Fleet composition20.39 M points
discharge lamps · 12.87 M, to convertLED · 6.75 Mother technologies · 0.77 M

The conversion is halfway through. What is missing is 12.9 million luminaires, with addresses, spread across municipalities.

Declared public lighting capacity does not reconcile with billed energy

Public lighting runs from sunset to sunrise, somewhere between 4,100 and 4,300 hours per year. Dividing the 13,452 GWh billed by the 5,839 MW declared gives 2,304 equivalent hours, a little over half of that. The two figures come from the same database and do not reconcile with each other.

There are three possible explanations and the database does not allow a choice between them: capacity declared by standard luminaire type, above the real load after the swap to LED; billing by an estimate contracted with the municipality, below physical consumption; and registered points that are not energized or are counted twice. Probably all three, in different proportions by agent.

The practical conclusion is direct. Use the point count as inventory. Do not use the declared megawatts as project load. Anyone sizing the energy savings of a public private partnership from BDGD capacity will get it wrong, and will get it wrong on the high side.

The load the database declares and the load the bill implies

megawatts · 13,452 GWh billed in 2024

Declared on luminaires5,839 MW
Implied at 4,200 h per yearabout 3,200 MW

A gap of 45%. The two figures come from the same database and do not reconcile with each other.

Half the generation capacity outside MMGD on the distribution networks has no identification

Beyond micro and mini generation, the distribution networks host granted or registered generation connected at medium and high voltage: 18,246 plants and 53,102 MW declared. The largest group is not a type of plant, it is the absence of one. The CEG is ANEEL’s unique identifier for a generation project. Without it there is no way to know which plant that is, who operates it or under which concession grant.

This is a statement about the registry, not about the Brazilian generation fleet, which is fully identified in other databases held by ANEEL itself. What the BDGD supports saying is that the generation layer of the filed databases is not usable for a hosting capacity study without prior treatment, and anyone using that field directly, without checking it against SIGA, ANEEL’s generation registry, or against the concession grant registry, is adding up megawatts that may be duplicates, unit errors or phantom plants.

Declared capacity outside MMGD

53,102 MW in 18,246 plants connected to the distribution networks

Capacity composition53,102 MW
no CEG code · 27,901 MW in 16,801 plantsproject identified · 25,201 MW

The 27.9 GW without identification equal 77% of all micro and mini generation in the country.

Sources for the regulatory statements: Law No. 15,269 of 24 November 2025, amending Law No. 9,074 of 7 July 1995. MME Normative Ordinance No. 50/GM/MME of 27 September 2022, effective as of 1 January 2024. Law No. 14,300 of 6 January 2022. Article 149-A of the Federal Constitution, added by Constitutional Amendment No. 39 of 19 December 2002. Minamata Convention on Mercury, enacted in Brazil by Decree No. 9,470 of 14 August 2018. The 24 and 36 month periods in Law No. 15,269 run from the date the provision takes effect, not from the date the law was published, and depend on regulation. This page is not an investment recommendation.

Low voltage · tariff Group B

The retail market of 89.6 million

Low voltage is the largest market in the country in units and in energy: 89.6 million active consumer units (UCs) consuming 247.6 TWh per year, an average of 230 kWh per month per unit. It is a market that is almost entirely captive and predominantly residential, and it is where distributed generation sits: 3.12 million units already have generation of their own connected.

Energy and units by consumption class

all classes in the ANEEL Data Dictionary, revision 3 · billed energy in 2024

ClassActive UCsEnergy · TWhSharekWh/month per unit
Residential78,827,262170.268.8%180
Commercial and services5,842,26047.019.0%671
Rural3,824,70615.96.4%347
Public administration577,2507.43.0%1,068
Industrial389,0054.11.7%883
Public utility service108,7052.61.0%1,968
Public lighting79,2981.10.4%1,168
Own consumption10,4350.30.1%2,548
Supply (conc./perm.)20.00.0%83,333
Not reported200.00.0%4,167
Total low voltage89,579,645247.6100.0%230

Interpretation of this table usually stops at the first row, and that is where it is least useful. Yes, residential is 88.0% of the units and 68.8% of the energy. But the figure that changes a decision is in the third column combined with the fifth: commercial and services has 6.5% of the units and 19.0% of the energy, because it consumes 671 kWh per month against 180 kWh for residential, almost four times more per connection point.

This sets the acquisition cost of any business that sells energy or service in low voltage. One commercial point is worth four residential ones in energy, and it is a single contract. The 5.8 million commercial points carry 47.0 TWh, more than the entire captive medium voltage market. When the opening of low voltage arrives, that is where it will start, not in the home.

The rural class, with 3.82 million units and 15.9 TWh, has average consumption of 347 kWh per month, almost twice the residential figure. It is not a marginal market: it is where the irrigation user, the poultry operation, small agro-industry and most of the permissionaires sit, and it is the segment with the highest penetration of distributed generation in the country.

Largest markets by number of units

millions of active low voltage units · 15 largest networks

CEMIG-D9.33 M
Enel SP7.89 M
COELBA6.25 M
CPFL-PAULISTA5.02 M
COPEL-DIS4.97 M
LIGHT SESA3.90 M
Neoenergia PE3.72 M
EQUATORIAL GO3.46 M
CELESC3.44 M
RGE SUL3.11 M
ELEKTRO2.98 M
EQUATORIAL PA2.98 M
EQUATORIAL MA2.79 M
ENEL RJ2.66 M
ENEL CE2.40 M

Average residential consumption, the extremes

kWh/month per UC · utilities with more than 50 thousand residential UCs · national average 180 kWh

ÂMBAR ENERGIA RR379 kWh
CEA304 kWh
Âmbar Amazonas277 kWh
ERO272 kWh
EMT269 kWh
CELESC240 kWh
CERTEL ENERGIA231 kWh
EMS224 kWh
EPB147 kWh
ESE145 kWh
EMR143 kWh
CEMIG-D139 kWh
Neoenergia PE138 kWh
EQUATORIAL AL136 kWh
COELBA124 kWh
SULGIPE94 kWh

The distance between the top and the bottom of this list is four times: 379 kWh per month at Âmbar Energia Roraima against 94 kWh at Sulgipe. Three factors explain most of it, and all of them can be verified outside this database: average temperature, which drives refrigeration and air conditioning; household income, which decides appliance ownership; and the share of the Tarifa Social, the low income tariff, which concentrates low consumption units. Roraima and Amapá appear at the top through the combination of climate and an urban profile concentrated in the state capitals. The Northeast and Minas Gerais appear at the bottom through the combination of income and the weight of low income consumers in the registry.

For anyone designing an energy retail product, this means that a national average tariff describes neither end. The same percentage discount on the bill is worth, in reais, four times more in Boa Vista than in Sergipe. For anyone sizing residential distributed generation, the payback calculation changes in the same proportion, and that is why rooftop diffusion does not follow the distribution of the population.

Medium voltage · A4, A3a and AS

The battleground of the free market

There are 299,793 UCs consuming 144.4 TWh per year, 29% of the energy distributed in 0.3% of the units. Since the opening of tariff Group A in January 2024, it is the most contested segment in the sector: 55,706 UCs are already free or special consumers and they carry 65.6% of the energy. Average consumption is 40.1 MWh per month per unit.

Energy and units by consumption class

all classes · billed energy in 2024

ClassActive UCsEnergy · TWhShareMWh/month per unit
Industrial65,93965.345.2%82.6
Commercial and services127,07448.733.7%31.9
Public administration35,5108.96.2%20.9
Rural46,7828.86.1%15.7
Public utility service13,5298.76.0%53.4
Supply (conc./perm.)3663.42.3%763.4
Residential9,5610.60.4%4.8
Own consumption1,0300.10.1%11.1
Public lighting2400.00.0%1.4
Not reported20.00.0%41.7
Total medium voltage299,793144.4100.0%40.1

The composition of medium voltage is the inverse of low voltage. Commercial and services has more units than industry, 127,074 against 65,939, but industry carries 45.2% of the energy against 33.7%, because it consumes 82.6 MWh per month against 31.9 MWh. These are two different free markets inside the same segment: one of few large contracts and one of many mid sized contracts, with completely different origination and portfolio management costs.

Public administration and rural together add up to 82,292 units and 17.7 TWh, with average consumption below 21 MWh per month. This is the band that MME Normative Ordinance No. 50/GM/MME of 27 September 2022 pushed into the free market without most of them having the structure to migrate on their own: a consumer with individual load below 500 kW has to be represented by a retail agent at CCEE, the Brazilian power trading chamber. Energy retail in tariff Group A is, largely, this block.

The supply line between concessionaires and permissionaires, with 366 units and 3.4 TWh, is not final consumption. It is the cooperatives buying from the concessionaire that supplies them. Anyone who adds up the energy column without removing this line counts the same energy twice.

Free market share of medium voltage energy

highest percentages among utilities with a medium voltage market above 0.3 TWh · national average 65.6%

EDP SP75.6%
LIGHT SESA74.9%
ELEKTRO74.8%
COPEL-DIS74.2%
CELESC74.2%
CPFL Piratininga73.3%
EMR72.1%
EDP ES70.9%
RGE SUL70.2%
Enel SP70.0%
CEMIG-D68.9%
ESS67.8%
ENEL RJ67.7%
CPFL-PAULISTA67.3%
CPFL JAGUARI66.9%

The networks with the most migration are those of the South and of the industrial Southeast, between 67% and 76%. It is no coincidence: where average load per unit is higher, the absolute gain from migration covers the cost of managing the contract, the energy backing and the collateral with room to spare. Where load is small and dispersed, it does not cover that cost, and the unit stays captive even though it has had the right to leave since 2024.

What is left is 49.6 TWh captive in 244,087 units, which gives average consumption of 16.9 MWh per month, less than half the segment average. The remaining migration stock in medium voltage is, by definition, the hardest slice and the least profitable per contract. Anyone projecting portfolio growth in tariff Group A by extrapolating the curve of the last two years is extrapolating over a sample that competitors have already picked through.

High voltage · A1, A2 and A3

2,135 units, 89.8 TWh

High voltage is small and heavy: 2,135 active consumer units (UCs) connected at 69 kV or above consume 89.8 TWh per year, an average of 42.0 GWh per unit. It is essentially industry, and almost all of it free market: 95.3% of the energy belongs to free-market consumers. The captive market is residual, 4.2 TWh across 388 units.

Energy and units by consumption class

all classes with an active unit in high voltage

ClassActive UCsEnergy · TWhShareGWh per year per UC
Industrial1,52072.881.1%47.9
Public utility service1575.66.2%35.5
Supply (conc./perm.)814.95.5%60.8
Commercial and services3164.75.2%14.8
Public administration281.41.6%50.4
Rural330.40.4%11.4
Total high voltage2,13589.8100.0%42.0

Two rows deserve separate reading. The one for public utility service, with 157 units and 5.6 TWh, is water and sanitation plus rail traction: treatment plants, pumping stations and subways. It is load with a predictable profile, public contracting and a long decision cycle, and it is where efficiency and load flexibility studies have the most technical room.

The one for supply between concessionaires and permissionaires, with 81 units and 4.9 TWh, is not consumption. This row is one utility buying from another. Added to the equivalent rows in medium and low voltage, it gives the 8.3 TWh of double counting that has to come out of any final consumption total.

Where the high voltage units are

TWh per year · 10 largest networks · 61 of the 101 utilities have no high voltage consumer at all

CEMIG-D17.0 TWh · 383 UCs
LIGHT SESA7.1 TWh · 53 UCs
CPFL-PAULISTA6.7 TWh · 176 UCs
EDP SP5.8 TWh · 95 UCs
Enel SP5.6 TWh · 184 UCs
CELESC5.4 TWh · 118 UCs
ELEKTRO5.2 TWh · 137 UCs
COPEL-DIS5.1 TWh · 71 UCs
CPFL Piratininga3.9 TWh · 65 UCs
EDP ES3.8 TWh · 33 UCs

Forty utilities have high voltage consumers. Ten of them concentrate 73.2% of the energy in the segment. Cemig D alone accounts for 17.0 TWh across 383 units, almost double the second-placed network.

Density per network varies a great deal and that matters for connection. Light has 7.1 TWh across 53 units, an average of 134 GWh per unit. Cemig D has 383 units averaging 44 GWh. These are different substation planning problems: one network with a few giant loads, another with many large loads spread out.

For peak load storage, for dedicated generation connection or for long-term bilateral contracting, this is the closed target list in Brazil. It fits in a spreadsheet and does not change from year to year at the rate low voltage does.

Public lighting · class B4 and the PIP lighting point registry

20.4 million points, 13.5 TWh

The BDGD sees public lighting along two paths: 20,386,239 physical points registered one by one on the utility networks and 79,538 consumer units in class B4 billed to municipalities. Together that is 20,465,777 records, 13.5 TWh per year, 2.7% of the distribution market, and 5,839 MW of declared load in lamps. The two registries describe different things: one is the pole, the other is the bill.

20.39 Mregistered lighting points
79,538consumer units in class B4
13.5 TWhbilled per year
5,839 MWof declared load
54.8 kWhper month per point

Installed base by lamp technology

the eleven categories declared in the database · active points and declared capacity

Lamp technologyPointsShareCapacity · MWW per point
Sodium vapor10,353,50050.79%3,014.1291
LED6,746,73733.09%2,055.2305
Mercury vapor1,343,5536.59%280.7209
Metal halide1,062,7115.21%327.4308
Other312,1721.53%82.7265
Induction fluor.203,1471.00%8.743
Incandescent159,9470.78%17.7111
Blended112,8260.55%28.0248
Compact fluor.84,2210.41%23.1274
Halogen4,3400.02%0.9207
Not reported3,0850.02%0.4130
Total20,386,239100.00%5,838.9286

Sodium vapor is still the majority, with 50.8% of the points, against 33.1% for LED. Adding sodium, mercury vapor, metal halide and blended together gives 12.87 million points on discharge lamps, all technical candidates for replacement. Mercury vapor, with 1.34 million points, has a deadline of its own: the high pressure mercury vapor lamp for general lighting is listed in Annex A of the Minamata Convention on Mercury, enacted in Brazil by Decree No. 9,470 of 14 August 2018, among the products whose manufacture, import and export were to be phased out by 2020. That share of the installed base is not a project choice, it is forced replacement driven by lamp unavailability.

The last column carries the uncomfortable finding of this section. The average declared capacity per LED point is 305 W, higher than the 291 W declared per sodium vapor point. Physically, an LED luminaire that replaces a sodium one draws far less. An installed base where LED shows up with higher capacity indicates that the capacity field is not being updated at replacement, or that conversion started on the larger roads, where the luminaire is bigger in both technologies, or both.

This has a direct consequence for modeling. Anyone estimating the energy savings of a retrofit using the declared capacity in BDGD as the baseline is computing on a figure that already embeds LED and that does not correspond to the physical installed load. The error does not have a single sign: it varies by concession, according to the stage of conversion and the registry discipline of each agent.

The test the database itself fails. Public lighting operates from sunset to sunrise, something between 4,100 and 4,300 hours per year. Dividing the 13,452 GWh billed by the 5,839 MW declared gives 2,304 equivalent hours per year, a little more than half. At 11.5 hours per night would imply an average load of about 3,203 MW, 45% below the declared capacity. Three causes are plausible and the database does not allow separating them: capacity filled in by standard luminaire type, billing by an estimate contracted with the municipality, and registered points that are switched off or duplicated. The practical recommendation is to use the point count as inventory and to treat the declared megawatts as indicative.

It is worth recording what this market has and the other four do not: a funding source already established and an asset already inventoried. Article 149-A of the Constitution, added by Constitutional Amendment No. 39 of 19 December 2002, authorizes municipalities and the Federal District to levy a charge to fund the public lighting service, with the option of collecting it on the electricity bill. On the asset side, BDGD delivers the registry point by point, georeferenced, by municipality.

That is why the public-private partnership for lighting is the dominant format in this market, and why the diligence phase of one of these transactions starts exactly here, cross-checking the utility registry against the field survey. The two counts never match, and the difference between them is one of the main sources of contractual dispute in these transactions.

Distributed generation · MMGD

36.3 GW inside the network

Distributed micro and mini generation (MMGD) closed 2024 with 3.19 million plants and 36.3 GW installed on the utility networks, exporting 37.2 TWh to the grid over the year. Those plants are connected to 3,175,655 consumer units, which comes to 3.5 plants per 100 units nationwide. The bulk sits in low voltage. But mini generation in medium voltage already adds up to 9.8 GW across 52,205 plants of 189 kW on average, which is the territory of 0.5 to 5 MW projects.

Breakdown by connection level

installed capacity, average size and energy exported to the grid · the last column is energy exported divided by installed capacity

Connection levelPlantsCapacity · MWAverage kW per plantEnergy exported · GWhExported over capacity
Low voltage3,135,13626,3828.425,46311.0%
Medium voltage52,2059,850188.711,70213.6%
High voltage10191,900.02112.6%
Total MMGD3,187,35136,25211.437,18711.7%

The last column needs a warning, because it looks like a capacity factor and is not. The BDGD records the energy that crosses the meter in the direction of the grid. What a unit generates and consumes at the same instant does not pass through there and does not exist in this database. The 11.0% in low voltage is the exported fraction, not the output of the system. The gap to the 13.6% in medium voltage comes precisely from that: mini generation is often remote generation that exports almost everything, while the residential roof consumes part of it on site.

The consequence is asymmetric and both sides are worth stating. Anyone estimating energy generated by MMGD from the BDGD understates the fleet. Anyone estimating net metering credit revenue from installed capacity overstates it, because only what was exported is credited. For power flow and hosting capacity studies, the right number is the exported one, which is what the grid sees.

Law No. 14,300 of 6 January 2022 separated the two sizes by definition: micro generation up to 75 kW, mini generation above 75 kW and capped at 5 MW for dispatchable sources and 3 MW for non dispatchable ones. The same law, in Article 26, granted a transition rule valid until 31 December 2045 to anyone who already had a system installed or who filed an access request within twelve months of publication. A material share of the 36.3 GW portrayed here is a fleet with a vested right to a net metering rule that is not repeated for anyone entering now, and that changes the return comparison between an existing asset and a new project.

Installed capacity, 15 largest networks

MW installed · number of plants alongside

CEMIG-D4,317 MW · 310,575 plants
COPEL-DIS2,759 MW · 239,236 plants
EMT2,542 MW · 163,644 plants
CPFL-PAULISTA2,264 MW · 229,564 plants
COELBA2,258 MW · 220,479 plants
RGE SUL1,988 MW · 250,307 plants
EQUATORIAL GO1,726 MW · 134,564 plants
CELESC1,593 MW · 125,625 plants
Neoenergia PE1,360 MW · 112,564 plants
EMS1,228 MW · 119,479 plants
EQUATORIAL PA1,127 MW · 109,310 plants
ELEKTRO1,117 MW · 130,828 plants
COSERN944 MW · 86,976 plants
ENEL CE942 MW · 70,927 plants
EDP ES822 MW · 60,505 plants

Penetration, plants per 100 UCs

leaders among networks with more than 20 thousand UCs · national average 3.5

CERMISSÕES12.4
EMS11.5
EMT10.8
CELETRO10.7
DEMEI9.8
HIDROPAN8.7
RGE SUL8.0
CERTEL ENERGIA7.6
ELETROCAR7.4
ETO7.0
CRELUZ-D6.9
ESS6.8

The two lists barely overlap. The one on the left ranks capacity and reproduces the ranking of market size. The one on the right ranks adoption and is dominated by permissionaires in Rio Grande do Sul and by networks in Mato Grosso and Mato Grosso do Sul.

The 50 permissionaires have 5.6 plants per 100 units against 3.5 for the national average. Rural area, available roof, high irradiation and an investment decision taken inside a membership base explain the difference. Anyone studying the diffusion of distributed generation in Brazil is looking at the saturation frontier there, not the average.

The generation that is not MMGD, and the hole in the registry

plants under concession grant or registration connected to the distribution networks, by type declared in the database

Beyond micro and mini generation, the distribution networks host generation under concession grant or registration connected at medium and high voltage. That comes to 18,246 plants and 53,102 MW declared. The problem shows up in the first row of the table.

Declared typePlantsCapacity · MWShare
No CEG code16,80127,90152.5%
Thermal4099,20017.3%
Hydro986,30611.9%
PCH, small hydro3644,8629.2%
Photovoltaic1792,6164.9%
Wind861,4482.7%
CGH, mini hydro3087691.4%
Total18,24653,102100.0%

The largest group is not a type of plant, it is the absence of one. 16,801 records, or 92.1% of the plants in this set, arrive with the CEG code blank, and add up to 27,901 MW, more than half the declared capacity. CEG is ANEEL’s unique identifier for a generation project: without it there is no way to say which plant it is, who operates it or under which concession grant. For comparison, those 27.9 GW without identification are equivalent to 77% of all micro and mini generation in the country.

This is a statement about the registry, not about the Brazilian generation fleet. The fleet is identified in SIGA, ANEEL’s generation registry, and in the concession grant records of ANEEL itself. What these numbers say is that the generation layer of the filed databases is not usable for hosting capacity studies without prior treatment. Adding that column up directly produces a total that may contain duplication, unit errors and records with no matching concession grant.

How to read these numbers. The capacity declared for plants outside MMGD is reported, not metered. Four utilities reported capacity with a scale error and, in those cases, MMGD capacity was re-estimated from the energy exported to the grid. Treat the set without a CEG code as indicative and check it against the concession grant records before using it in a connection study.

Market structure

Regional concentration, not national

None of the five markets is concentrated on a national scale, with a Herfindahl-Hirschman Index (HHI) between 411 and 751 out of a maximum of 10,000. Real concentration is regional, because each utility is a monopoly inside its concession area. The 4 largest networks carry about 32% of the energy and the 10 largest carry 54% to 73% depending on the segment.

SegmentHHITop 4Top 10
LV45531.7%57.4%
MV49032.9%61.8%
HV75140.8%73.2%
Lighting41128.2%54.0%
DG49632.8%60.8%

The national HHI here is a measure of exposure, not of market power. No utility competes with another for a customer, so a low index does not mean competition. What it measures, for whoever sells to utilities or invests in the sector, is how much of the market depends on few counterparties. High voltage has an HHI of 751 and 73.2% of the energy in ten networks: whoever serves that segment carries high customer concentration risk. Public lighting has an HHI of 411 and 54.0% in ten networks, the most fragmented of the five markets, and for that reason the one with the highest origination cost per contract.

It is worth repeating what the difference between concession and permit means at scale. The 51 concessionaires account for 88.9 million low voltage units and 245.2 TWh. The 50 permissionaires account for 656,378 units and 2.3 TWh. They are the same number of regulated agents, with two percentage points of difference in economic weight, and the regulatory cost of each one is not proportional to its size. That asymmetry is the origin of much of the regulatory simplification agenda for permissionaires.

Dashboard

The 101 utilities, side by side

Click a header to sort. Use the search box to filter by utility code, state or agent type. All energy columns are in GWh per year and all counts are of units active on the reference date of each database.

Five utilities appear marked with !. Those are the ones whose filed database deviates from SAMP, ANEEL’s market monitoring system, by more than 15%, and they are explained in the methodology. Their row describes only part of the agent’s market and should not be used on its own.

UtilityTypeStateReference dateLV consumer unitsLV · GWhMV consumer unitsMV · GWhHV consumer unitsHV · GWhLighting pointsLighting · GWhDG plantsDG · MW

Methodology, validation and limitations

How these numbers were produced

Where the data comes from

The BDGD is the geographic distribution database each utility is required to file with ANEEL, set out in Module 10 of the Distribution Procedures (PRODIST), approved by Annex X of ANEEL Normative Resolution No. 956 of 7 December 2021. ANEEL publishes the files of every utility on its Open Data Portal, as one geodatabase per agent. Every piece of data on this page is public and can be downloaded by anyone. What is not public is the treatment: extraction, schema standardization across agents, class reconciliation and checking against an independent source.

The geodatabases of the 101 active utilities were obtained, about 33 GB, and the UCBT, UCMT, UCAT, PIP and UGBT, UGMT and UGAT entities were processed: 105.7 million consumer unit records, 20.7 million lighting points and 3.21 million plants.

Tabulation criteria

Energy is the sum of the twelve monthly fields, ENE_01 to ENE_12, and in UCAT the sum of peak and off peak. Units with SIT_ATIV equal to AT are taken as active. Classes follow the ANEEL Data Dictionary, revision 3. Free-market consumer is the LIV field. MMGD are the plants carrying a CEG code of type GD. Ninety-seven databases have a reference date of 31 December 2024; Coprel, Cooperaliança, Ceres and Cerci remain at 31 December 2023, and the Reference date column in the dashboard identifies which.

The agent codes are the ones ANEEL publishes in the database itself. Where a company changed its name after the filing, the current commercial name appears alongside: ELETROPAULO is Enel Distribuição São Paulo and is written as Eletropaulo / Enel SP. The dashboard search accepts both forms.

Validation, and what a discrepancy means

The result was checked against two independent sources: SAMP with an aggregate deviation of 1.9% in energy, and the EPE Statistical Yearbook of Electricity in the class by class reconciliation shown at the top of this page.

SAMP is fed by the same utility that files the BDGD, through a different route and on a different schedule. When the two diverge, the difference does not say which of them is right. It says that the database filed in that year does not describe the whole market of the agent. For anyone using the data, the consequence is practical: the row of that utility is incomplete.

Five agents diverge by more than 15% and are marked in the dashboard:

UtilityDeviation against SAMPWhat the filed database shows
Coprelminus 96%no low voltage and no medium voltage units, only public lighting points and one high voltage unit
Certhilplus 32%energy above what was reported to SAMP
Cermcminus 26%energy below what was reported to SAMP
Enel CEminus 19%energy below what was reported to SAMP
Equatorial PIplus 16%energy above what was reported to SAMP

The Coprel case is the most extreme and the easiest to read: the file that was filed carries no low voltage and no medium voltage consumer unit. The row exists in the dashboard because the database exists, and it comes marked because it describes a fraction of the market of the agent. Without the marking, anyone sorting the table would conclude that the utility has no consumers, which is not the case. None of these observations is about how the companies operate: it is about how a registry file was filled in, and ANEEL itself treats BDGD quality as a process under continuous improvement.

Limitations worth remembering

  • The BDGD portrays 31 December 2024. Distributed generation in 2025 and 2026 is already larger.
  • The energy is what was billed on the utility network and does not include simultaneous self-consumption from distributed generation. Energy exported to the grid is not energy generated.
  • Units under the same CNPJ, the Brazilian company tax number, sitting in several states appear by connection point, not by company.
  • The 495.2 TWh of the market include 8.3 TWh of supply between concessionaires and permissionaires, which is not final consumption.
  • The capacity of plants outside MMGD is declared, not metered, and more than half of it arrives with no CEG code.
  • The declared capacity for public lighting does not reconcile with the billed energy, in the proportion described in the public lighting section. Use the count of lighting points, not the megawatts.
  • For a market time series, SAMP is the natural complementary source. The BDGD is an annual snapshot, not a series.

Compiled from the ANEEL BDGD, reference date 31 December 2024, with four permissionaires at 31 December 2023. Checked against SAMP and against the EPE Statistical Yearbook of Electricity. August 2026.

The complete dataset

The aggregates on this page come from a tabulation broken out by class, subclass, tariff group and status, together with the correction log for each agent and the file checking the result against SAMP. The set is sent in CSV to anyone who asks by e-mail at amatiri@amatirienergia.com.br, and the direct download goes on this page as soon as it is published. Free to use, with attribution to Amatiri Energia and to the ANEEL geographic distribution database (BDGD).

Amatiri Energia is an engineering and regulatory advisory firm for the power sector, registered with CREA, the Brazilian engineering council, under corporate registration 2543985. Every deliverable is issued with a registered ART, the Brazilian engineering technical responsibility record, and a named engineer of record. This page is not an investment recommendation.